Project Control Construction

Project Control

Project control is vital since it ensures that resources, budgets, and time are used effectively. In addition, the project control is significant as it enables the project manager to evaluate the progress of the project and adjust on the shortcomings and risks that are encountered during the completion of the project as discussed below.

Earned Value Management Techniques

As a project manager of a 5000m2 retail development construction project, the project control measures are very vital in the quest to achieve the goals. Control of this project can be conducted using the Earned Value Management, EVM. The EVM evaluates the progress of the project embracing the objective approach (APM, 2013: 7). This technique is very significant as it enhances the control work which can be conducted at any period, hence, determining the current status of the project. The EVM embraces the use of a baseline project plan to control the desired outcome. In this method, the cost management as well as the schedule of the project evaluations are conducted in an integrated manner (APM, 2013: 9).

Some of the goals of the 5000m2 retail development construction project include maintaining budget and minimizing costs. This necessitated the allocation of specific amount of the resources including the human capital. In this regard, project control enables the project manager to have a control of how the project progresses considering the time taken for each activity undertaken (APM, 2013: 9). More so, the cost of the project is controlled using EVM is necessary to evade the misuse of the resources and finance allocated for the project which could jeopardize the outcome. Apart from that, EVM project control is vital since there is absolute need to deliver positive results which are useful in answering the business case (APM, 2013: 7).

Project Control Measures

Using measures such as the evaluation of the performance reports can be of great importance in ensuring that project scope including project plan, schedule among others are helping the project manager deliver the goals of the project as stipulated before the project commenced (Fleming and Koppelman, 2010: 54-55). As the project work progresses, the project manager should be informed about the achievements made as well as the cost that has been used by the time performance reporting was been conducted. EVM also enables the manager to have an estimation of the final cost of the project together with time that is likely to be consumed (APM, 2013: 9). The EVM gives a clear overview of the progress and the status of the project which is essential for the project management since the resources as well as activities are arranged in logical sequence. This ensures that the activities are at as planed in the baseline project (APM, 2013: 9).

Project Control Dissertation
Project Control – Roland Wanner

Project Control Risk Planning Initiative

As a manager, it is necessary to initiate the risk planning so that the risks that are encountered in the project can be handled (APM, 2013: 60). The progressive evaluation of the status of the project vividly indicates the risks that the project faces. In addition there is a clear forecast of the future risks that the project might encounter. Therefore, planning for the risk is inevitable in a construction project. The previous projects can be used to evaluate the project risks.

In addition, benchmarking on similar projects can be a useful technique under the EVM control of risks. Moreover, the risk management software can be incorporated to deduce both the cost risk analysis as well as the schedule risk analysis (APM, 2013: 68). This is because the construction project’s completion time is usually scheduled and there is a need to manage the time so that the project does not run behind the schedule. Moreover, the finances and other resources are allocated in a sequential and logical manner. Hence, conducting schedule risk analysis ensures that the project status is as outlined in the baseline project (APM, 2013: 69).

More so, any discrepancies are managed using the appropriate methods that does not cause cost variance. This is because the allocation of finances is done when the project plan is made. Furthermore, the change control management is vital so that the risks mitigation processes can achieve the desired goals of the project (Fleming and Koppelman, 2010: 206).

Controlling the Project Plan and Schedule

As  project manager, it is necessary to ensure that the baseline project and project plan are achievable and useful in supporting the business case. In this regard, the project plan can be changed if the project manger determines that there are shortcomings to its effectiveness and validity. In addition, if there are some external and unplanned forces such as the political instability, the project plan can hence be altered (APM, 2013: 73).

One of the possible ways is the EVM Compass Maturity Model (APM, 2013: 73). This model is necessary as it ensures that capability project control is improved. This is done through rating the progress of the project on a scale of 5 with 5 as the highest score. Therefore, project manager and stakeholders evaluates the EVM attributes such as cost, time, resources, and finances, among others and rate their performance relying on the realistic and evidence based approach (APM, 2013: 73-74). On the other hand, the baseline review is another method that can be used to control the project plan and schedule. The baseline reviews can be conducted by an independent firm hence giving reliable information about the status of the project, the project manager can thereafter act accordingly.

Data trace assessment is another technique embraced under the EVM since all the data carried out in the project is evaluated and a detailed and valid status of the project (Fleming and Koppelman, 2010: 211). In addition, tracing the resources will help in project control as the will safeguard the time schedule of the project. Tracing resources is another technique which shows the progress of the project as it evaluates the distribution of resource within the different areas of the project. This is necessary in ensuring that time is effectively managed as well as ensuring that the resource use is matching their viability (APM, 2013: 75).

Reviewing Collected Data and Acting

Acting on the collected data is vital as the possible and necessary changes for the project are enhanced. Reviewing the schedule performance index determines how far behind or ahead the project is running which enables time management. Moreover, the cost performance index which represents the cost of the earned value to the total costs of the project helps in budgeting trace which controls the finance management (APM, 2013: 80). Comparing the current performance of the project is a suitable way to forecast and plan for the future.

Evaluating EV Reports

The test of project reasonableness can be conducted through evaluating the Earned Value reports. These reports can be produced progressively as the project work advances. The EV reports are vital as they enable the project manager to improve on the management techniques so that the project goals as outlines in the plan are realized (APM, 2013: 90). More so, evaluating these reports ensures the current risks are encountered as well as laying down concrete plans for the forecasted risks.

In addition, setting the cost and variance a threshold ensures the parameters such as cost and schedule of the projects are analyzed effectively (APM, 2013: 105). If the variance or the cost is above the threshold at any given time then there should be drastic changes. The project manager controls the project to ensure that reasonableness is always maintained (Fleming and Koppelman, 2010).

References

Association of Project Management HandBook (2013) Earned Value Management ISBN 13: 978-1-903494-47-9

W Fleming and Joel M Koppelman (2010) Earned Value”, Project Management, Fourth Edition – ISBN – 978-1-935589-08-2

Roland Wanner (2014) “Earned Value Management”, The most important methods and tools for an effective Project Control by Roland Wanner 2014 – ISBN – 978-1500850234

Relevant Posts

Construction Management Dissertations

Project Management UAE Construction Industry

Construction Dissertation PMO Implementation

If you enjoyed reading this post on project control within construction I would be very grateful if you could help spread this knowledge by emailing this post to a friend, or sharing it on Twitter or Facebook. Thank you.

Construction Management Dissertation Topics

Construction Management Dissertation Topics and Building Studies Dissertations

Construction Management Dissertation Topics – At study-aids.co.uk we have many questions fielded to us relating to building studies dissertation topics. This takes into quantity surveying and built environment students, we like to think that we can take a student from the stage of choosing a topic to writing a well-structured dissertation themselves. We feel that our dissertation collection contain the best case practice illustrated with numerous examples, case studies and references, all of which are a great source of inspiration.

Our collection of construction management dissertation topics cover key aspects such as research planning, data collection and methodology, as well as structuring and writing the dissertation, in fact, everything needed for a successful write-up. We urge you to take some time out and read through the vast construction dissertation titles we have to offer.

Our construction dissertations provide guidance on research formulation, methodologies, and methods specifically for construction students, the research we offer extends to cover many areas of concern in quantitative and qualitative research, including research ethics.

The dissertations we hold discuss the methods adopted for scientific and engineering research, model building and simulations, as well as methods employed for research into management, social and economic issues relating to the construction environment. We examine the requirements for data and analysis, including the important statistical factors and an array of qualitative techniques that enable construction students to appreciate what needs to be evaluated in devising how a dissertation should be structured. These factors should not be overlooked.

Construction Management Dissertation Topics
Construction Management Dissertation Topics

The construction dissertations we offer will help you in the problem solving stage, the dissertations will be of value to construction, quantity surveying, architecture and civil engineering students undertaking research, whether for undergraduate and postgraduate degrees. As previously mentioned the dissertation collection covers many areas of concern in quantitative and qualitative research, including research ethics at all levels of study.

Below is a list of construction and building studies dissertations which reflects the key areas of academic interest and expertise found among construction students. You may already have a clear idea about what you want to research, but in order to help you through this process of topic selection, we have developed the list below;

Construction Dissertation – Difficulties in Implementing Lean Construction in The UK

Construction Dissertation – Implementation and Adoption of Photovoltaics (PV) in the UK

Construction Dissertation – Uutilization of Solar Thermal Energy in the UK

Construction Dissertation – Labour Shortages In The UK Construction Industry And Its Implications

Construction Dissertation – Timber Frame Housing, A Time Effective Solution

Choosing a Sample Dissertation

Choosing to assess our dissertations will provide practical guidance and will help to steer you into a position where you can develop a good dissertation by integrating your practical skills with academic theoretical tools delivered at your university.

We always start by discussing the dissertation structure, it starts with material that should be in the introduction and finishes with material that should be in the conclusion. The dissertation projects provide commentary on the kind of information that you should put in each chapter of your dissertation, supported by a variety of examples using a range of methodological designs.

Our dissertations focus on data collection, data analysis, reliability and validity, these are areas you need to pay close attention to. The qualitative and quantitative analysis contained within our dissertations will show you how to carry out a meticulous analysis while avoiding some of the complexity in statistical work, this is something that should not be afraid of.

You will see at first hand that our construction dissertations will help you to write a more innovative and thorough dissertation. For your own benefit you are strongly advised to choose from this list, but if you wish to research a different field, approach the member of staff you think most appropriate for your needs and discuss it.

About Our Construction Management Dissertation Topics

Our collection of Construction Management Dissertation Topics are ideal resources for students involved in research in building and quantity surveying and construction management. It is vitally important to remember that the content and presentation of your dissertation should be in accordance with your university guidelines. Feel free to add your additional comments to this post.

While the most common topics can vary depending on the current trends and issues in the industry, here are some of the most common construction management research topics:

  • Cost estimation and cost control in construction projects
  • Sustainable construction and green building practices
  • Building information modeling (BIM) and its impact on quantity surveying
  • Risk management and mitigation in construction projects
  • Procurement strategies and contract management
  • Value engineering and value management in construction projects
  • Project management and project delivery methods
  • Building maintenance and facility management
  • Construction management practices in developing countries
  • Quantity surveying and its role in public infrastructure projects
  • These topics cover a wide range of issues in the quantity surveying field and offer plenty of opportunities for original research and analysis

However, it’s important to conduct thorough research and choose a research topic that aligns with your interests, skills, and expertise.

Here are some advantages of conducting original research and writing a dissertation:

Developing critical thinking skills: Writing a dissertation requires a deep understanding of the research topic and the ability to critically analyze existing literature. This process helps to develop critical thinking skills that are valuable in many aspects of life.

Gaining expertise in a specific area: Conducting original research on a specific topic allows you to gain expertise in that area. This knowledge can be useful in future academic pursuits or in a professional career.

Contributing to the construction management field: By conducting original research, you have the opportunity to contribute new knowledge and insights to your field. This can help to advance the field and benefit society as a whole.

Demonstrating research skills: Writing a dissertation demonstrates your ability to plan and execute a research project, collect and analyze data, and communicate findings in a clear and concise manner. These skills are highly valued by employers and can be useful in many professional settings.

Enhancing construction career opportunities: A well-written dissertation can enhance your career opportunities by demonstrating your expertise and research skills to potential employers. It can also open doors to further academic pursuits, such as pursuing a degree or conducting further research.

In conclusion, conducting original research and writing a construction management dissertation has many advantages that cannot be obtained through buying pre-written dissertations. It allows you to develop critical thinking skills, gain expertise in a specific area, contribute to the field, demonstrate research skills, and enhance career opportunities.

Click Here To View Construction Management Dissertation Topics